- Keep the number of specialist contractors to a minimum.
- Ensure contracts provide clarity on design responsibilities and scope, with particular emphasis on interfaces.
- When considering savings that may be offered/proposed at the pre-construction stage, question whether these savings have the potential to generate costs in the longer term (risk assess).
- Diarise regular design team meetings with all specialist facade contractors present.
- Engage suitably experienced facade package managers and facade consultants.
- Test unusual / untried interface details off site.
- Agree robust QA procedures prior to starting on site.
- Construct quality and installation reference benchmark areas on site that include examples of both the standard and non-standard details/arrangements.
- Site test 5% of all interface waterproofing details.